Indigenous infrastructure gap estimated at more than $425B ( www.cbc.ca )

As the Trudeau government prepares to release this year's federal budget, Indigenous organizations estimate it would take more than $425 billion to close the infrastructure gap in their communities by the government's 2030 goal.

While the bulk of that staggering sum comes from the Assembly of First Nations' nearly $350-billion assessment of the infrastructure gap facing an on-reserve population of 400,000, the assembly is not alone in this exercise.

The national organization for 70,000 Inuit in Canada says it would cost $75.1 billion to close the gap in Inuit Nunangat, the traditional northern Inuit homeland encompassing 51 communities and four regions.

JohnnyCanuck ,
@JohnnyCanuck@lemmy.ca avatar

Unless I mathed wrong, that's over 1 million dollars per person that the AFN is estimating. Seems unrealistic to me, but I'm not an expert.

girlfreddy OP ,
@girlfreddy@lemmy.ca avatar

How much do you think it costs to build a water treatment plant on each of the 28 First Nations communities that have boil water advisories?

Or the cost of fixing/building the "estimated 85,700 existing housing units, 34% require minor repairs and 31% require major repairs. An additional 108,803 housing units are needed to address overcrowding, replacement, and population growth." PDF source

Or the cost of repairing/replacing the "202 First Nations schools are overcrowded and require additions; 56 First
Nations schools require immediate replacement based on reported poor conditions. Estimates indicate that First Nations are only being funded 23% of their educational capital needs when compared to the Government of Canada’s budget 2021 commitments." PDF source

JohnnyCanuck ,
@JohnnyCanuck@lemmy.ca avatar

How much do you think it costs to...

I guess that's my question. My estimate would easily be a factor of 10 lower.

A quick search gives me this for a treatment plant for a town in Ontario: $32 million (https://www.wellingtonadvertiser.com/erin-wastewater-treatment-plant-will-cost-town-up-to-32-million/). So we're under a billion dollars and all 28 communities now have proper water. What are we even waiting for, let's go!

At $200k to build per 1500 sq ft single family home (possibly aggressively low, but I'm using this to guide my numbers, and trying to go average: https://wowa.ca/how-much-does-it-cost-to-build-a-house), for 90000 homes we're around $20 billion. Call it $25 billion with hookups (I don't know if that was included on wowa.ca)

In 2018 it cost $30 million to build an elementary school in Thunder Bay. Let's call it $50 million and for 56 schools we're at 3 billion dollars.

Still only at $30 billion.

girlfreddy OP ,
@girlfreddy@lemmy.ca avatar

Does that include transportation costs to remote communities? Don't forget that transportation is either by ice road or airplane, and global warming is shortening the ice road season to weeks instead of months.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • random
  • canada@lemmy.ca
  • test
  • worldmews
  • mews
  • All magazines