Trainguyrom OP ,

I won't be leaving all of them on for long at all. I've got a few basically unused 15A electrical circuits in the unfinished basement (can see the wires and visually trace the entire runs) I'll probably only run all 25 long enough to run a linpack benchmark and maybe run some kind of AI model on the distributed compute then start getting rid of at least half of them

  • All
  • Subscribed
  • Moderated
  • Favorites
  • random
  • selfhosted@lemmy.world
  • test
  • worldmews
  • mews
  • All magazines